Kegerator

From Pumping Station One
Jump to navigation Jump to search

Concept

This is what I envision as our final kegerator set up:

[1]

[2]

With the front mounted tap set up from the first link, using the materials/construction instructions from the second. Once we gather the materials we should be able to get it together in a couple days. That said, I would like to have it set up for at least one beer by the time our P-P-Power Ale is ready to drink. This will save us the pleasure of a bottling party, and enable us to drink it in a day or so, rather than waiting for a secondary fermentation.

Materials

- 2 x 4 's ( I haven't measured yet, but I estimate about about 16 ft.)

- 1 x 6's (also about 16 ft)

- Polyurethane/stain of some sort

- Silicone sealant

- CO2 tank and regulator (Steve is letting us use his for the time being, but we need to eventually purchase our own)

- (4) Beer faucets w/ levers

- (4) 3" shanks with nipple assemblies

- 20 Feet 5/16" Vinyl Gas Tubing (5' per tap)

- 20 Feet 3/16" Beverage Tubing (5' per tap)

- 4 x Liquid Quick Disconnects

- 4 x Gas Quick Disconnects

- 4-Way Gas Manifold

- Temperature controller

- 2 x cornelius keg ( I think John said we can borrow these from him)

- 16 x hose clamps