Line 16: |
Line 16: |
| | | |
| <ol> | | <ol> |
− | <li>Donated Commercial Stove - Free, will install in-house.</li> | + | <li>Donated Commercial Range - Free, will install in-house.</li> |
− | * Commercial Stove Vent Hood $1000.00 - Shelly and Gerald located a commercial stove vent hood in great condition at Evanston Rebuilders Warehouse. It is being held without deposit for up to two weeks. If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial stove vent hood (4000.00). | + | * Commercial Range Vent Hood $1500.00 - New Commercial Range Hood |
− | * Install a 10" ventilation duct for the commercial stove in the kitchen - $300.00. | + | Used may be missing insert - Shelly and Gerald located a residential stove vent hood in great condition at Evanston Rebuilders Warehouse. It is being held without deposit for up to two weeks. If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial range vent hood. |
− | * Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial stove. | + | * Install a 10" ventilation duct for the commercial range in the kitchen - $300.00. |
| + | * Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range. |
| <li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.</li> | | <li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.</li> |
| <li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li> | | <li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li> |
Line 40: |
Line 41: |
| </ol> | | </ol> |
| | | |
− | Sub total: $3000 | + | Sub total: $3500 |
| plus 20% contingency funds | | plus 20% contingency funds |
− | Total $3600.00 | + | Total $4200.00 |
| | | |
| == Language == | | == Language == |
| | | |
− | We authorize the board to spend up to $3600.00 for equipment, materials and supplies to renovate the kitchen. | + | We authorize the board to spend up to $4200.00 for equipment, materials and supplies to renovate the kitchen. |
| | | |
| The funding for this vote will expire 6 months from the date of approval. | | The funding for this vote will expire 6 months from the date of approval. |